CPDC shutsdown two ACN lines for turnaround
Taiwan-based China Petrochemical Development Corporation (CPDC) has undertaken a turnaround of its two acrylonitrile (ACN) lines.
A CDPC official told fibre2fashion that line No-1 has been taken offstream on November 3 and line No-2 on November 5. They will remain shutdown for a period of 2 weeks.
The ACN plant located in Kaohsiung, Taiwan has a total production capacity of 240,000 tons per year.
转载本网专稿请注明出处“中国纺织网”
编辑:纺织网